Progress, even somewhat slow is going forward, have been fixing things on the site from time to time.
Fixed SSL certificate to the site so now it runs completely via HTTPS.
The To-Do list looks like this for now.
To-Do list
New things that need fixing will be added constantly.
- Get development section up and running.
- Add documentation.
- Fix RSS flow on each active project.
- Continue development on active projects.
- Get SVN repository up and running.
Partially.- Complete.
- Add back projects.
- oBacklight.
Basic info with download.Complete info with download, documentation & SVN connection.(2014-07-30)
- oZimbraBackup.
Basic info with download.Complete info with download, documentation & SVN connection.(2015-10-27)
- oBacklight.
- Get How-To section up and running.
- Add How-To:s.
Fix Contact page.- Fix site RSS flow
- Fix About page.
Fix License page.- Set up site navigation.
Link to Development.- Link to About.
Link to License page.- Link to Documentation.
- Link to How-To:s.
Link to Contact.
Secured site with SSL.(2017-06-30)